How it works

From plan photo to invoice, with a human-verifiable overlay.

FootingTakeoff is not a black box that spits out a number. Every measurement is drawn on your plan so you can see exactly what was counted, what was excluded, and why.

STEP 01

Upload the plan

PDF permit set or a phone photo of the paper plan. The system locates the foundation page, reads the dimension strings, the wall schedule, and any handwritten margin notes.

STEP 02

Review the overlay

The measured takeoff is drawn directly on the plan: green labels on runs the system is confident about, red flags with reasoning on anything unusual — an unclear dimension, an ambiguous wall type, a conflicting margin note. You check the flags, not the whole plan.

STEP 03

Export the invoice

Your rates are stored once: $/LF base, $/LF with rebar, flat $ per pad. Every takeoff comes back as invoice line items — 312 LF @ $3.00, 4 pads @ $50 — totaled and dated.

What gets measured

ElementHow it is handled
Outer perimeter footings Measured out-to-out along the full perimeter chain
Interior foundation-wall footings Measured per run and included in the LF total
Concrete support pads Detected, counted, and priced per pad
Rebar call-outs Read from plan notes; switches the LF rate to your rebar rate
Non-scope items (wood-frame bearing strips, window wells) Excluded by default, listed separately so nothing is hidden

Try it on your own plans first.

Free while in early access. No spam — one email when your account is ready.