- Takeoff
- A takeoff is the process of measuring quantities off a set of plans to price or order the work. A footing takeoff measures every footing run to produce total linear feet plus the count of pads and piers, which is what a footing subcontractor bills from.
- Linear foot (LF)
- A linear foot is one foot measured along a length, and it is the unit continuous footings are measured and billed in. A footing sub’s primary quantity is total linear feet of footing; pads and piers are counted separately as units.
- Cross-section
- A footing’s cross-section is its width times its thickness — the shape you would see if you sliced across it. Cross-section times length gives the concrete volume, so the cross-section, not the depth of burial, is what drives cubic yards on a takeoff.
- Cubic yard
- A cubic yard is 27 cubic feet, and it is the unit ready-mix concrete is ordered and sold in. Footing concrete volume is calculated in cubic feet from the cross-section and length, then divided by 27 to order in cubic yards.
- Unit price
- A unit price is a rate charged per unit of work — per linear foot of footing, or a flat rate per pad or pier. Footing subs bill from unit prices so an estimate is the measured quantity multiplied by the agreed rate for each item.
- Bid
- A bid is a priced offer to do a defined scope of work. A footing bid is built from the takeoff quantities — linear feet, pad and pier counts — multiplied by the sub’s unit prices, plus any allowances for access, rebar, and site conditions.
- Ready-mix
- Ready-mix is concrete batched at a plant and delivered by truck, ordered by the cubic yard for a scheduled pour. Footing pours are almost always ready-mix, and the order quantity comes from the takeoff volume plus an allowance for over-excavation and waste.
- Over-excavation
- Over-excavation is soil dug beyond the neat footing dimensions — from uneven trench bottoms, sloughing sides, or intentional over-dig — that fills with extra concrete on an unformed pour. It is why a concrete order carries a waste allowance above the calculated footing volume.